Browse Tag: air conditioning

3 Signs You May Have Mold or Mildew in Your Air Conditioning Unit

3 Signs You May Have Mold or Mildew in Your Air Conditioning Unit

One of the most common problems with air conditioning and heating is mold and mildew in the HVAC unit. But it’s not always obvious. Below are three signs that your air conditioning unit might have mold or mildew in it.

  1. Mildew Smell

An excellent way to tell you that you have mold in your HVAC system is to catch the smell of mildew. While your AC is running, do a quick sniff. If you smell something mildewy, you want to have it checked out.

  1. Flare-ups of Allergies

Many people who suffer from allergies are sensitive to particles inside the air. This includes mold spores. If you notice that your family members with allergies are having more problems, the HVAC unit could have mildew and mold. Mold and mildew in the system can lead to many health problems.

  1. The Duct Vents Have Mold/Mildew

An obvious sign that there is mildew or mold in the HVAC system is that the ducts have it on them. Examine the vents in your house. Open up the grates and take out the air filters. Then look at them to see if there’s anything there. if you are noticing spores on the vents, chances are it’s through your system.

These are three signs that there could be mold in your air conditioning unit. If you notice any of them, it’s a good idea to contact your local HVAC professional and have them come over to do an inspection and cleaning, as well as regular maintenance on your system as needed.

6 Steps to the Perfect DIY Inground Pool

 How to build a swimming pool on your own! Here you get the tips from the pros! The swimming pool builders gave the right tips for a wonderful DIY pool!

The process of building the swimming pool is not very simple, and each professional can follow a line, but in general, this method we separate is one of the most used. Among the numerous variations in the process some items can influence, such as a suspended pool or infinity pool, since both have somewhat different characteristics in the construction process.

The steps of building the swimming pool are:

The first step in the process of building a swimming pool is to decide what size and shape the pool will be. And at this point it is necessary to consider the space available on the ground, and to ponder reality with their expectations.

Second: the Depth: Another important detail that should be considered is the depth that the pool will have. To do this, consider whether or not children will use the pool, and also assess the terrain to see if the installation site does not pass pipes that can be damaged in the excavation process.

Third: the Excavation: The practical moment of the process of construction of the pool arrived. Now that you already have the dimensions and shapes of the pool, you have to dig the ground following the guidelines that determine the sizes. In this step, remember that the structure occupies a little space, so it is necessary to dig a little more the sides (about 15 to 20 cm more). To sustain the excavation, some wooden planks may aid the step.

Number four, Machine Digging is Faster Falling on the Floor: It is not enough just to follow a method of building a pool without considering very important details. And one of them is a small drop in the floor directed towards the drain, which makes the drainage of water easier.

Number five, Pipes: Before making the pool crate, make all necessary facilities and consider the holes required in the design; like outlet and water inlet. Structure with blocks: after digging the pool hole it is time to start the structure. In this step, make walls with structural blocks, as if they were walls, around the edge of the pool. In the middle of the blocks use hardware to ensure lift. One tip in this step is to make a double wall and the medium “stuffed” with brittle stones, ensuring a more reinforced structure for the pool.

Last but not least when building theswimming pool

The walls were made with structural block waterproofing, as the sixth tip: with the walls and floor already ready, it is time to waterproof this layer. To do this, use asphalt or waterproofing mortar, so as to avoid possible infiltration into the structure. Finishing: with the ducts already installed, walls ready and waterproofed, it is time to leave for the finishing of the swimming pool. Among the possibilities of coating, the tablets and ceramics are the most used. After this finished step, just clean the pool and fill!  For more tips and 100% quality results contact swimming pool builders!


Web Design BangladeshWeb Design BangladeshMymensingh